Strengthening the wall – London Borough of Haringey
Background The London Borough of Haringey appointed us to undertake the feasibility study, investigations and design for strengthening of the existing highway retaining wall. The problematic area included a 160m long and 2.5m high retaining wall adjacent to a busy bus route. The wall had an inadequate loading capacity and stability issues, which was imposingRead more